POSEIDON HOME PAGE 

For General Information on the ownership and a description of the system, Click here.

Poseidon Operational Statement

Poseidon Oil Pipeline Company is receiving oil on its 24" segment between SS 332 and Houma. The 20" segment between SMI 205 and SS 332 returned to service on October 16th. Poseidon is receiving oil from points upstream of the SMI 205 Platform, including emergency flow from the Auger Pipeline. 

AUGER CONNECTION Emergency Reversal  

 The Auger connection became active April 1, 2008.   As a result of the storm damage deliveries to Auger have been suspended. On October 29 at 7:00 am Poseidon reversed the connection to accept barrels from Auger upstream of SMI 205. Flow from SMI 205 to Houma will continue until such time as Auger begins accepting nominations to SS 28.

 Quality_Vol.jpg (23847 bytes)

                   NOVEMBER Quality and Quality Bank factors JANUARY pricing data,  Click on links below.

               JUNE  ASSAY,  NOW AVAILABLE Click Here!

 

NEWPOP MAP.gif (58299 bytes)

Click  to request a system map.   

For  information on the Poseidon Oil Pipeline System click on one of the links below.

 Price_diff.jpg (20166 bytes)Quality_Bnk.jpg (17276 bytes)Quality_Vol.jpg (23847 bytes)Assay Bench.gif (4367 bytes)Assay.jpg (65977 bytes)Contact.jpg (19392 bytes)

Click above for Current Bench or Full 2006 Assay

  Click on the Links to go to the desired information.  For  Information or answers to questions not found here, please contact us.

Copyright © 2000 
Last modified: January 05, 2009            TOP OF PAGE

135070